 |
Speed Control Systems Use:
For the slalom and jump events at the 2008 Regional’s and Nationals, eligible towboat manufacturers will be required to designate on or by July 1, 2008 a speed control system to be used per event in each division in their allotted events (as selected in the official boat draw); and boat draws may differ for Regional’s and Nationals.
|
|